Paint Inspection Kit in Pakistan

Paint Inspection Kit in Pakistan

  • Rs.0



Product Description:

The Paint Inspection Kit contains all the essential equipment needed for the testing of blast-cleaned steel prior to the coating application.

When steel has been blast-cleaned to a surface preparation of Sa 2½, the inspection of the steel to ISO Standards is required.  This ISO Standard compliance ensures that blast-cleaned steel is correctly prepared for the application of protective coatings.

Supplied in an industrial Carrying Case with Testex Tape / Testex Gauge,  Bresle Patch Test, Dust Tape Test, Dewpoint Meter, Coating Thickness Meter, and Wet Film Gauge (pack of 5).  Calibration Certificates with traceability to UKAS are an optional extra.

Technical Specifications:

The equipment supplied in the Paint Inspection Kit will enable on-site testing for all six stages of blast-cleaned steel and coating inspection in the following stages:

Stage 1 (ISO 8503-5 and NACE SP0287) Surface profile measurement of the blasted profile.

Stage 2 (ISO 8502-6, and ISO 8502-9) Surface cleanliness testing for soluble salts.

Stage 3 (ISO 8502-3) Surface cleanliness assessment for the quantity and size of dust particles.

Stage 4 (ISO 8502-4) Climatic conditions for the estimation of the probability of condensation.

Stage 5 (ISO 2808) Wet film measurement to ensure the correct wet film thickness has been applied.

Stage 6 (ISO 2808 and ISO 19840) Coating Thickness measurement to ensure the correct coating thickness has been applied.

Download the Data Sheet of the Paint Inspection Kit 

Tags: Paint Inspection Kit, Paint Inspection Kit in Pakistan,